Case Studies

Abu Dhabi National Oil Company Headquarters

Completion: 2015. Generalunternehmer: Six Construkt. Consultant : Meinhart.
Installed Area: 55.000 m2. Height: 342 Meter. 74 Stockwerke.


Case Studies

Sheikh Zayed Mosque / Abu Dhabi

Completion: 2007. Contractor: Six Construkt. Installed Area: 145.000 m2.
Height of the prayer dome: 75m. Minarett-Height: 107m. Capacity: 40.000 Believer.


Case Studies

Museum of Islamic Arts / Doha, Qatar

Architect: I.M. Pei Architects. Contractors: Baytur Construction. Consultant: Halcrow.
Installation Area: 60.000 qm.


Case Studies

White Square Office Centre / Moskau

Completion: 2010. Architect: EHMAP. Construction Company: ENKA Construction. Installation Area: 18.000 m2.